FIREPLACELAB
Wood heat, locally

Massachusetts installation guides.

Stove permits and inspections in Massachusetts run through each city or town’s building department. MassCEC says it is not planning to run its Woodstove Change-Out rebate program in future years, so do not budget for that rebate.

MassCEC: Learn about woodstoves
44 towns

Choose your city.

  1. Amherst

    Hampshire County / Pioneer Valley

    Amherst’s building fee schedule prices wood stoves and chimneys as their own $30 permit item, and two local historic districts review visible exterior changes.

    Read the guide
  2. Attleboro

    Bristol County / Southeastern Massachusetts

    Attleboro waives the building permit fee for owners aged 60 or older in owner-occupied one- and two-family homes, and triples the fee when work starts before a permit.

    Read the guide
  3. Barnstable

    Barnstable County / Cape Cod

    Barnstable files wood stoves on an expedited permit application, but if a property has structures over 75 years old or sits in a historic district, historic approval must come before the permit is issued.

    Read the guide
  4. Beverly

    Essex County / North Shore

    Beverly requires a separate building permit for every woodstove, even one going into an addition or new home that already has a permit, because the stove gets its own certificate.

    Read the guide
  5. Boston

    Suffolk County / Greater Boston

    Beacon Hill’s architectural guidelines require historic chimneys to be retained and mechanical equipment kept out of view from a public way.

    Read the guide
  6. Braintree

    Norfolk County / South Shore

    Braintree’s Building Division says the contractor is responsible for pulling the building permit on owner-occupied one- to four-family homes, and owners who pull their own lose Home Improvement Contractor program recourse.

    Read the guide
  7. Bridgewater

    Plymouth County

    Bridgewater charges a flat $75 stove permit, and starting work before the permit card is in hand can cost triple the permit fee.

    Read the guide
  8. Brockton

    Plymouth County / Metro South

    Brockton’s building ordinance adds a surcharge of twice the permit fee when work starts before a permit has been issued.

    Read the guide
  9. Cambridge

    Middlesex County / Greater Boston

    In Cambridge’s historic and neighborhood conservation districts, a Historical Commission certificate is always needed to get a building permit, even for interior-only work.

    Read the guide
  10. Chelsea

    Suffolk County / Greater Boston

    Chelsea’s Certificate of Habitability ordinance has every rental unit inspected at least every five years, while units their landlord lives in are exempt, so a stove here is usually an owner-occupant’s project.

    Read the guide
  11. Everett

    Middlesex County / Greater Boston

    Everett’s building fee ordinance lists woodstoves as a flat $40 permit, and work started without a permit is charged double the fee as a fine on top of the fee itself.

    Read the guide
  12. Fall River

    Bristol County / South Coast

    Fall River’s Historical Commission asks applicants in the Highlands local historic district to show stove pipe locations on their drawings, and no building permit issues there without its certificate.

    Read the guide
  13. Fitchburg

    Worcester County / North Central Massachusetts

    Fitchburg’s solid fuel appliance application asks for the stove’s testing lab and label number, a hearth with at least one-hour fire resistance, and whether anything else shares the flue.

    Read the guide
  14. Framingham

    Middlesex County / MetroWest

    Framingham has its own Solid Fuel Burning Stove Permit Application, which asks for the stove’s maker, model, serial number, testing lab and test date.

    Read the guide
  15. Franklin

    Norfolk County

    Franklin’s Building Department keeps its own woodstove permit packet: two copies of the stove maker’s installation instructions, one stamped and returned to stay on site for the inspector, plus a two-copy installation checklist.

    Read the guide
  16. Gloucester

    Essex County / Cape Ann

    Gloucester’s building inspectors keep short office windows, 8:30 to 9:30 a.m. weekdays and 1 to 2 p.m. Monday to Thursday, and every building permit must be filed online.

    Read the guide
  17. Haverhill

    Essex County / Merrimack Valley

    Haverhill’s city code sets a flat $30 fee for solid fuel burning stove permits and chimney permits, doubled if work starts before a permit.

    Read the guide
  18. Lawrence

    Essex County / Merrimack Valley

    Lawrence’s one- and two-family permit application carries a City Ordinance Section 25-10 sign-off list: taxes, water and sewer, and trash tickets must be cleared before a permit is issued.

    Read the guide
  19. Leominster

    Worcester County / North Central Massachusetts

    Leominster charges a flat $40 per wood or pellet stove permit and has its own stove application asking for the chimney, flue size, hearth and installer’s licenses.

    Read the guide
  20. Lowell

    Middlesex County / Merrimack Valley

    Lowell has its own wood stove permit page: every wood stove needs a building permit, filed with the manufacturer’s installation instructions showing clearances.

    Read the guide
  21. Lynn

    Essex County / North Shore

    Lynn’s Inspectional Services charges a $25 administrative fee, in effect since January 1, 2025, to process a permit application filed on paper instead of through its online portal.

    Read the guide
  22. Malden

    Middlesex County / Greater Boston

    Malden’s building fee schedule lists wood stoves as their own $75 line item and charges triple the fee when work starts without a permit.

    Read the guide
  23. Marlborough

    Middlesex County / MetroWest

    Marlborough charges a flat $50 for a solid fuel stove permit and asks whoever installed it to sign a certification covering clearances, hearth size, venting and fresh air intake.

    Read the guide
  24. Medford

    Middlesex County / Greater Boston

    Medford’s fee schedule sets a $50 wood burning stove installation inspection fee with no application fee, and charges four times the fee when building work starts without a permit.

    Read the guide
  25. Melrose

    Middlesex County / Greater Boston

    Melrose lists solid and pellet fuel burning appliances as their own permit type, and its fee schedule charges triple when work starts without a permit.

    Read the guide
  26. Methuen

    Essex County / Merrimack Valley

    Methuen’s building fee schedule charges a flat $50 for each wood stove, while chimney, fireplace and pellet stove work is billed at $13 per $1,000 of stated construction value.

    Read the guide
  27. New Bedford

    Bristol County / South Coast

    Inside the Bedford-Landing Waterfront Historic District, the New Bedford Historical Commission must approve all exterior changes before Inspectional Services can issue a building permit.

    Read the guide
  28. Newton

    Middlesex County / Greater Boston

    Newton’s Historical Commission must review partial demolition of any building 50 or more years old, which the city defines as removing or enclosing half or more of a roof or exterior wall.

    Read the guide
  29. North Attleborough

    Bristol County

    North Attleborough’s 2024 fee schedule prices a solid fuel burning appliance or masonry chimney permit at $50, but unpermitted work costs the permit fee plus $500, or double, whichever is higher.

    Read the guide
  30. Northampton

    Hampshire County

    Northampton’s April 2026 fee schedule prices a solid fuel burning appliance as a flat $65 specialty permit, and the city has charged a $50 processing fee for paper applications since online permitting began in June 2026.

    Read the guide
  31. Peabody

    Essex County / North Shore

    Peabody’s building permit fee for one- and two-family homes is $15 per $1,000 of construction value with a $75 minimum, and work done without a permit is charged double.

    Read the guide
  32. Pittsfield

    Berkshire County / The Berkshires

    Pittsfield’s fee schedule lists stoves and wood, pellet, coal and fireplace inserts as their own $45 residential permit items, and its building FAQ says chimney liners need a permit too.

    Read the guide
  33. Quincy

    Norfolk County / South Shore

    Quincy’s two local historic districts, Quincy Center and Adams Birthplace, need a Historical Commission certificate before the city issues a building permit for visible exterior changes.

    Read the guide
  34. Randolph

    Norfolk County / South of Boston

    Randolph’s fee ordinance gives wood, coal and pellet stoves their own line, a $50 solid fuel appliance permit, and charges double the permit value for work done without one.

    Read the guide
  35. Revere

    Suffolk County / Greater Boston

    Revere’s Building Division takes permit applications online only, and its 2025 fee ordinance charges three times the permit fee when work starts before a permit is obtained.

    Read the guide
  36. Salem

    Essex County / North Shore

    Salem files wood stoves under building permits and bills them at $20 per $1,000 instead of $15 when the building has three or more units.

    Read the guide
  37. Somerville

    Middlesex County / Greater Boston

    In Somerville, an owner-occupant can pull a building permit for a one- or two-family home, but a three-family or larger building needs a licensed contractor to apply.

    Read the guide
  38. Taunton

    Bristol County / Southeastern Massachusetts

    Taunton’s Historic District Commission lists chimneys as architectural features, so a visible chimney change around Church Green needs its certificate before a building permit.

    Read the guide
  39. Waltham

    Middlesex County / Greater Boston

    Waltham’s permit checklist has its own entry for pellet and wood-burning stoves and says they must be installed by a certified installer.

    Read the guide
  40. Watertown

    Middlesex County / Greater Boston

    Watertown’s permit portal lets an owner apply for a one- or two-family building permit only if they live in the home or will once the work is done; other buildings need a licensed construction supervisor.

    Read the guide
  41. Westfield

    Hampden County / Western Massachusetts

    Westfield’s residential building fee schedule, effective July 1, 2024, lists wood, pellet and coal stoves as a flat $75 permit, and fees double if work starts before the application is on file.

    Read the guide
  42. Weymouth

    Norfolk County / South Shore

    Weymouth’s building permit page lists wood stoves by name among the jobs that need a building permit, and its sheet metal permit form has a checkbox for metal chimneys and vents.

    Read the guide
  43. Woburn

    Middlesex County / north of Boston

    Woburn’s Inspectional Services FAQ names wood stoves and chimneys among work needing a building permit, and says the fee is doubled when work starts without one.

    Read the guide
  44. Worcester

    Worcester County / Central Massachusetts

    Worcester’s Fire Prevention Division sends wood, pellet and coal stove permit questions to the Building & Zoning Division of Inspectional Services.

    Read the guide

We add guides as local research is completed. Rules and business coverage vary by address. Explore national planning guides for areas not yet covered.